Blog

Discover our latest articles and blogs

Expanding Mandrels: 0.0005 inch Tuning for Machinists and Reloaders
September 9, 2026

Expanding Mandrels: 0.0005 inch Tuning for Machinists and Reloaders

Practical shop guidance for machinists and reloaders on choosing, setting up, and maintaining expanding mandrels. Includes 0.0005 inch tuning, safety, and...

Engineers: Reproduce a Shop's CNC Quote Formula to Sanity Check 2026 Rates
September 8, 2026

Engineers: Reproduce a Shop's CNC Quote Formula to Sanity Check 2026 Rates

Engineer focused 2026 CNC machining pricing guide. Reproduce a shop's quoting formula, check shop rates, and cut prototype cost by batching.

Start With One FAI When Outsourcing CNC Machining for Procurement
September 7, 2026

Start With One FAI When Outsourcing CNC Machining for Procurement

Procurement teams: a shop ready playbook to vet CNC suppliers, send complete RFQs, and require FAI/CMM before scaling short-run prototypes.

5 Factors Engineers Use to Choose Part Marking Methods
September 6, 2026

5 Factors Engineers Use to Choose Part Marking Methods

Engineer-focused, shop-ready guidance for selecting part marking methods. Learn five practical factors and a 7-step checklist to match material,...

Tenths of a Micron Matter: How Machine Shops Control Lap Plate Flatness
September 5, 2026

Tenths of a Micron Matter: How Machine Shops Control Lap Plate Flatness

Shop floor guide to lap plate flatness: measure, correct wear with conditioning rings, choose abrasives, and log readings to prevent scrap.

Cut Rework: 12–24 Hour Dwell for Anodize Masking on CNC Parts
September 4, 2026

Cut Rework: 12–24 Hour Dwell for Anodize Masking on CNC Parts

Shop tested guide for CNC engineers: choose tape, plugs, or UV maskant, follow a 12–24 hour dwell, and add drawing callouts to cut rework.

Last 10%: Press Fit Tolerances Engineers Need From the Shop
September 3, 2026

Last 10%: Press Fit Tolerances Engineers Need From the Shop

Use ISO/ANSI fit tables, interference math, and shop proven DFM to set press fit tolerances that avoid loose fits, galling, and hub cracks.

Rapid CNC Prototyping for Engineers: Production Intent in 2–3 Days
September 2, 2026

Rapid CNC Prototyping for Engineers: Production Intent in 2–3 Days

Shop backed guide for engineers: get production intent CNC prototypes fast. Use shop DFM and a complete STEP file to cut lead time to 2–3 days.

Stand, Breathe, Damp the Bars: Beat Dirtbike Arm Pump Without Surgery
August 31, 2026

Stand, Breathe, Damp the Bars: Beat Dirtbike Arm Pump Without Surgery

A guide focused on technique to beat dirtbike arm pump. Use fixes you can do during rides, bar damping and setup tips, targeted training, and when to see...